Crew staging the job site
Diver-welders attaching the 3000 Tee studs necessary to hang the rebar and provide an anchor the existing structure
Transition plates ready for installationdesigned to tie the existing sheet pie bulkhead to the new sheet pile
Lowering up river transition plate into place
Lowering down river transition plate into place
Down river transition plate bolted up and ready for reinforcing steel
Commercial diver hydroblasting surface prior to placeing steel
Epoxy coated rebar cage installed
Threading sheet pile
Threaded sheets ready for final drive
Bolting up last sheet
Sheet pile after trimmint to grade
Sheet pile recoated, with curb rebar placed and ready for concrete
Concrete placed and wetting down the burlap
Curb form removed and surface sealed
Fitting up lighting conduits
Completed project at demobilization
Installation of fender